Squared has been engaged by South Eastern Program Alliance to supply and install over 350 tonnes of structural steel for the new Ringwood East Station as part of the Dublin Rd Level Crossing Removal Project.
This includes prefabricated lift shafts, canopies and stairs that will be supplied and installed by our team. In addition to this Squared will supply and install approximately 1500 lineal meters of architectural screens around the perimeter of the new rail under track.
Build for a better future